Duck Lake Road Improvement Project

Project Summary

The Duck Lake Road Improvement Project is proposed to include the following primary components:

  • Reconstruct roadway from Duck Lake Trail to approximately Mallard Court. Reconstruction will include the addition of concrete curbs and gutters.
  • Addition of a bituminous trail on the west side of Duck Lake Road from Duck Lake Trail to Pavelka Drive.
  • Addition of a concrete sidewalk (from the proposed pedestrian railroad crossing from Eden Prairie High School to Duck Lake Road) on the east side of Duck Lake Road to South Shore Lane.
  • Addition of storm water management features.

Design work on the project is ongoing. The majority of the construction is anticipated to occur in 2019, however it is possible that soil corrections may begin in the fall of 2018.

Project Contact
Mary Krause, senior project engineer
952-949-8315

Related Information
Project Location Map [PDF]
Layout Plan [PDF]