Hwy 169

Print
Press Enter to show all options, press Tab go to next option

PROJECT SUMMARY
The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on Highway 169 between Highway 55 and Highway 62. This will include:

  • Closing the southbound exit and entrance ramps on Highway 169 at 16th Street and installing a visual barrier
  • Improving the safety of entrance and exit ramps at Cedar Lake Road by lengthening the ramps
  • Replacing the Highway 169 bridge between Bren Road and 7th Street (5th Street-Lincoln Drive exit)
  • Repairing pavement between Highway 55 and Highway 62
  • Repairing noise walls, replacing the concrete barrier and improving pedestrian accessibility at intersections throughout the corridor

These projects will improve driver safety and accessibility, and provide a smoother road surface and longer lasting bridge once completed.

CONSTRUCTION SCHEDULE
November 2016 through fall 2017, weather permitting.

FOR MORE INFORMATION
Andrew Lutaya, P.E.
MnDOT Project Manager
651-234-7563